Underground Production Systems

Unit Outline (Higher Education)

   
?   Display Outline Guidelines      


Effective Term: 2024/05
Institute / School :Institute of Innovation, Science & Sustainability
Unit Title: Underground Production Systems
Unit ID: ENGIN5512
Credit Points: 15.00
Prerequisite(s): Nil
Co-requisite(s): Nil
Exclusion(s): (ENMIN5130)
ASCED: 030303
Other Change:  
Brief description of the Unit

This unit qualifies participants to apply an advanced body of knowledge in the area of underground mining and equips them with highly developed skills for research and enquiry. Students enrolled in this unit will be able to apply the body of knowledge to a range of contexts within the mining industry enabling them to undertake professional or highly skilled work within the mining industry and allow them to undertake further study.

Grade Scheme: Graded (HD, D, C, P, MF, F, XF)
Work Experience Indicator:
No work experience
Placement Component:
Supplementary Assessment:No
Supplementary assessment is not available to students who gain a fail in this Unit.
Course Level:
Level of Unit in CourseAQF Level(s) of Course
5678910
Introductory                                                
Intermediate                                                
Advanced                                        
Learning Outcomes:
Knowledge:
K1.

Outline the conditions to set up a new mine.

K2.

Recall commonly used underground mining methods.

K3.

Discuss key parameters/factors used in determining which production system should be used.

K4.

Analyse the effect of dilution on profitability and the relationship between dilution and recovery.

K5.

Account for the major equipment and major development requirements for each underground mining method.

Skills:
S1.

Appraise, consolidate and synthesise knowledge and identify and provide solutions to complex underground mining problems.

S2.

Compare technically feasible mining methods for a mineral deposit.

S3.

Select appropriate tools, which may include computer software,  to solve problems in underground mining.

S4.

Select major equipment and major mine developments required for the commonly used mining methods.

Application of knowledge and skills:
A1.

Assess a mineral deposit and recommend technical feasible mining methods.

A2.

Plan the mine developments required for an underground mining system, and recommend the major equipment required.

Unit Content:

Topics may include: Setting up a new mine. Optimal selection of an underground production system. Mining methods, infrastructure requirements and impact on mine service requirements. Mining methods resource requirements.

Graduate Attributes:
 Learning Outcomes AssessedAssessment TasksAssessment TypeWeighting
1.

K1-5, S1-4, A1

AT1-2: Numerical and conceptual tasks

Written assignments

30-40%

2.

K1-5, S1-4, A1-2

AT3: Design Project

Written design project report

40-60%

3.

K2-5, S1-4, A1-2

AT4: Underground mine site report

PowerPoint Presentation

10-30%

Adopted Reference Style:
Other  ()

Professional Standards / Competencies:
 Standard / Competency